A driveway needs no permit. A street does, it costs money and it takes days, so it is the one thing worth sorting before anything else.

  • Driveway: no permit
  • Street: city permit
  • Allow several days

Where It Can Sit

Private ground needs no permit. Public ground always does

On your own driveway, in a private parking lot or on a fenced construction site, a bin needs no permission from anyone. That covers the large majority of rentals and is why most people never encounter a permit at all.

On a public street, sidewalk, lane or boulevard it is different. That is a right-of-way, and occupying it needs a permit from the city. In Windsor that is a street occupation permit, and the fee is typically somewhere between $20 and $150 depending on the municipality and the duration.

The cost is rarely the problem; the timing is. Processing runs from several days to several weeks depending on the city and the season, so a street placement should be started about a week before you want the bin. Driveway protection covers the private option. More sits on bin rental guides. Bin rental prices sets out the detail.

An empty roll-off container standing on an open parking lot
No permit Driveway
Permit Street
Days to weeks Processing

Getting One

Four steps to a street placement permit

  1. Confirm it is needed

    Street, sidewalk or lane needs one. Driveway or private lot does not.

  2. Apply to the city

    Usually public works or engineering. Some cities do it online, some do not.

  3. Allow the time

    Several days to several weeks. Start about a week before you want the bin.

  4. Meet the conditions

    Some cities require boards under the bin, reflectors or cones as a condition.

Placement Rules

What decides where a bin can physically go

Length first: a 10 or 14 yard fits most driveways, a 20 needs about 22 feet, and a 40 needs about 25 feet of clear space so the rear door can swing open. Without that clearance the door cannot be used at all.

Then overhead. The truck lifts the bin high to load and unload, so low branches, wires and garage overhangs matter more than people expect. A driver will not risk a service line, and that is a wasted trip.

Then surface and slope. Soft ground, fresh sod and steep drives are all problems, and asphalt in summer heat marks under a loaded bin unless boards go down. Every driveway placement gets boards from us. Delivery and pickup covers what else has to be clear.

Check overhead too
A loader riding the rear step of a refuse truck
An orange hook-lift container truck parked on a street

Straight Answers

Windsor dumpster permit questions

No. Private ground, whether a driveway, a parking lot or a fenced site, needs no permit from anyone.
Yes. A street, sidewalk or lane is public right-of-way and needs a street occupation permit from the city.
Typically $20 to $150 depending on the municipality and how long the bin will be there.
Several days to several weeks depending on the city and the time of year. Start about a week before you want the bin.
Many municipalities cap it at around 30 days a year. For a normal seven or ten day rental it never comes up.

Customer reviews

What Windsor customers say about permits and placement

★★★★★ 4.9 · 138 reviews on Google
Read all reviews →
★★★★★

Told me the permit would take a week before I booked. Everyone else said "no problem" and meant it was mine to solve.

L. Chartrand
Street placement, Windsor
★★★★★

They checked the overhead wires on the phone. The driver would have had a problem otherwise.

A. Reyes
Driveway bin, Chatham
★★★★★

Sorted the placement with the building rather than leaving it to me to argue about.

T. Okonjo
Condo bin, Leamington
★★★★

Permit took longer than quoted, which was the city not them. They kept me informed.

R. Kalim
Lane placement, Amherstburg

Ready When You Are

Find out whether you need a permit

Tell us the address and where the bin would sit. We will tell you whether it needs a city permit and roughly how long that takes.

Driveway: no permit · Street: city permit · Start a week ahead