Skip to main content
Next-day bin drop-off across Windsor · Flat price with the weight allowance included
(613) 324-9141

Roofing Bins

Windsor roofing dumpster rental sized by the bundle

Shingle tear-offs priced the way roofers count them, in bundles rather than yards, because shingles are dense enough that the yard number misleads.

  • 140 bundles in a 10 yd
  • 180 in a 14 yd
  • Placed at the eave

Counting Bundles

A roofing bin is measured in bundles, not cubic yards

Asphalt shingle is one of the densest things a roofer loads, so a bin can hit its tonnage while it still looks half empty. Counting in bundles is the only sizing that works: about 140 bundles in a 10 yard and about 180 in a 14.

Measured by roof area, a 20 yard takes the shingles off a house of roughly 1,600 to 2,000 square feet, single layer. A second layer of old shingle roughly doubles the weight, which catches out anyone sizing off the square footage alone.

Cedar shake and flat-roof tear-offs behave differently again: lighter per square but far bulkier, so those take a 40 yard rather than a small bin. Weight limits and overage has the tonnage for each size, and bin sizes the dimensions.

An orange hook-lift container truck parked on a street
140 bundles 10 yard
180 bundles 14 yard
2,000 sq ft 20 yard

On The Roof

Four steps for a roofing tear-off bin

  1. Count the bundles

    Or give us the roof area and the number of layers. Either sizes it.

  2. Placed at the eave

    Under the drop point, so nothing is carried and nothing lands on the lawn.

  3. Boards on the drive

    Every driveway placement, and we ask about asphalt in hot weather.

  4. Collected same week

    Most tear-offs are one or two days, so the bin rarely stays the full period.

Roof Waste

What else the roofing bin takes besides shingles

Underlay, ice and water shield, drip edge, flashing, ridge vent, rotten decking and the nails that come with all of it go in the same bin as the shingles and cause no trouble at the transfer station.

What does not is anything from the mechanical side of the roof. An old cooling unit or rooftop appliance on a flat roof still holds refrigerant and has to be drained and tagged by someone certified before it can be loaded.

On a pre-1990 building, old roofing felt and some flashing compounds can contain asbestos, which is refused outright. If there is any doubt, test before the tear-off rather than after. Prohibited items lists the refusals, and demolition debris covers a full strip.

Check pre-1990 roofs
A grapple loading a trailer inside a transfer station
A roll-off container on a dock beside a ship gangway

Straight Answers

Windsor roofing dumpster questions

A 10 yard takes about 140 bundles and a 14 yard about 180. For a 1,600 to 2,000 square foot roof, single layer, a 20 yard is the usual choice.
It roughly doubles the weight. Size off the bundle count including both layers, not off the roof area alone.
Yes, and that is where it should be. Dropping straight into the bin saves the lawn and the labour of carrying.
Both are bulkier and lighter per square, so they take a bigger bin. A 40 yard is common for a flat roof tear-off.
On pre-1990 buildings it can, along with some flashing compounds. Asbestos is refused in a bin, so test before the tear-off rather than after.

Customer reviews

What Windsor roofers say about a roofing bin

★★★★★ 4.9 · 138 reviews on Google
Read all reviews →
★★★★★

Sized it by bundles rather than guessing at yards. Came in under the tonnage on both bins.

Roofing contractor
Shingle tear-off, Windsor
★★★★★

They asked how many layers before quoting. Nobody else did and it would have cost me.

Roofer
Two-layer tear-off, Amherstburg
★★★★★

Bin went right under the eave and boards went down on the drive. No mess on the lawn at all.

Homeowner
Roof replacement, Leamington
★★★★

Forty yard, delivered on time. Access was tight and it took the driver a while to place it.

Site foreman
Flat roof, London

Ready When You Are

Get a roofing bin priced by the bundle

Give us the bundle count or the roof area and the number of layers. We will size it so the bin can still be hauled when it is full.

Sized by bundle · Placed at the eave · Boards on every driveway