Roll-Off Sizes
Larger Bins
Get Started
Before You Book
Driveway Care
Windsor dumpster driveway protection, boards on every drop
What a loaded bin does to asphalt, concrete and interlock, and the precautions that stop it, including the one that matters most in July.
- Boards every time
- Asphalt asked about first
- Nothing dragged
What Marks A Drive
A loaded bin concentrates weight onto four small points
A bin does not sit flat. It rests on rails and rollers, so several tonnes ends up on a few narrow strips of surface. On cold concrete that is usually fine. On warm asphalt it is not, because asphalt softens with temperature and takes an impression.
That is why the season matters more than the driveway. The same bin on the same drive in October and in July behaves differently, and July is when marks happen. We ask about surface and timing before booking rather than after.
Boards go under the rails on every driveway placement, which spreads the load across a much larger area. Nothing is ever dragged on or off, because dragging is what causes scoring rather than compression. Permits and placement covers the surface and slope questions. The full list is on bin rental guides. Bin rental prices covers the rest.
Protecting It
Four precautions on a driveway bin placement
-
Tell us the surface
Asphalt, concrete, interlock or gravel. Each behaves differently under load.
-
Boards under the rails
Laid before the bin comes off, spreading the load rather than concentrating it.
-
Placed, not dragged
Rolled off and set down. Dragging is what scores a surface.
-
Watch the heat
On a hot day on fresh asphalt, we will suggest a different spot rather than risk it.
Interlock And Slopes
The two driveway types that need a conversation first
Interlock and paver drives are laid on a sand bed, and concentrated load can settle individual stones even with boards down. It is usually fine for a small bin and a short rental, and it is worth thinking about for a large one.
Slopes are the other. A bin on a slope wants to move, so it needs chocking, and a steep drive can make it impossible to place safely at all. If the drive is steep, tell us before the truck is scheduled rather than when it is there.
Fresh asphalt within its first season is the case where we will usually recommend somewhere else entirely. None of this is common, but all of it is cheaper as a phone call than as a repair. Delivery and pickup covers access. Bin rental guides goes through it properly.
Other Guides
Other bin rental guides for Windsor
The rest of what decides how a rental goes.
How it works
The rental end to end, call to scale ticket.
Learn moreWhat size do I need
Sizing by room, roof and pickup load.
Learn morePermits and placement
When a street permit is needed and how long it takes.
Learn moreRental periods
Seven or ten days, and what an extension costs.
Learn moreDelivery and pickup
Windows, access and what has to be clear.
Learn moreAvoiding extra fees
Every fee, what triggers it, how to avoid it.
Learn moreStraight Answers
Windsor driveway protection questions
New asphalt and they suggested the side pad instead. Would not have thought of it myself.
Boards went down without me asking. Not a mark on a two year old drive.
Asked about interlock before booking. Ended up on the concrete apron instead, which was right.
Careful driver, no damage. The slope needed chocking and took a few minutes longer.
Ready When You Are
Tell us about the driveway before we come
Surface, slope, age and what is overhead. Four details and we will place the bin somewhere it cannot cause a problem.
Boards every time · Nothing dragged · Fresh asphalt placed elsewhere